Send Message
products
products
Home > products > Agricultural Steel Buildings > Industrial Prefab Steel Structure Building , Metal Farm Shed Building

Industrial Prefab Steel Structure Building , Metal Farm Shed Building

Product Details

Place of Origin: Shenyang

Brand Name: QHHK

Certification: ISO/WAS

Model Number: Q235,Q355

Payment & Shipping Terms

Minimum Order Quantity: 500sqm

Price: usd $55-88 square meter

Packaging Details: Well packed, palleted and loaded into 20ft 40ft ship container for prefabricated steel warehouse flat pack packing.

Delivery Time: 15-25 work days

Payment Terms: L/C, T/T, Western Union

Supply Ability: 5000 Square Meters per Month

Get Best Price
Highlight:

Industrial Prefab Steel Structure Building

,

Prefab Farm Shed Building

,

Metal Farm Shed Building

Type:
Light
Standard:
GB,ASTM,AISI,BS,DIN
Secondary Frame:
C&Z Purlin, Brace
Product Name:
Industrial Factory Building Multi-storey Steel Structure Warehouse
Purlin:
C.Z Shape Steel Channel
Application:
Frame Part
Certification:
ISO9001:2015,ISO14001:2015,ISO45001:2018
Type:
Light
Standard:
GB,ASTM,AISI,BS,DIN
Secondary Frame:
C&Z Purlin, Brace
Product Name:
Industrial Factory Building Multi-storey Steel Structure Warehouse
Purlin:
C.Z Shape Steel Channel
Application:
Frame Part
Certification:
ISO9001:2015,ISO14001:2015,ISO45001:2018
Industrial Prefab Steel Structure Building , Metal Farm Shed Building

Industrial Prefab Steel Structure Building , Metal Farm Shed Building

 

 

Product Parameters:

 

 

Main Product Farm Building,Barn ,Shed ,Storage, Warehouse, Cow shed, Cattle House
Steel Frame H .C ,Z ,T beam , Material grade :Q235,Q355 or as request.
Column & Rafter Welded or Hot rolled H-section
Door Rolled shutter door or Sliding door
Wall & Roof EPS, Rockwool, PU sandwich, corrugated steel sheet
Window Plastic steel or Aluminum alloy window
Surface Shot blasting with anti rust paint or hot dip galvanize(More RAL color as per request)
Production Lines 2 production lines of light steel,heavy steel,space frame and tube truss.
5 production lines of color steel plate and other envelope structures.
Equipment

NC pipe cutting machine, CNC hydrauic shearing machine, Hydraulic sheet

metal blending machine, Gantry submerged arc welding machine, Corrugated

sheet molding machine, Shot blasting machine, Punching machine,Drilling Machine,

Forging machine, H-section assembly machine,Straightener,

H beam 3D drilling Machine etc.

Quality Control The third party ,SGS, ASIA INSPECTION all accept

 

 

 

Industrial Prefab Steel Structure Building , Metal Farm Shed Building 0

Factors affecting the price of steel structure Building: 

 

1. Raw material prices
Fluctuations in the price of steel have an important impact on the price of steel structure buildings. The increase in steel prices will directly cause the overall price of steel structure buildings to rise.

2. External load
External loads include wind load, snow load, dead load, and live load. Structural engineers calculate the steel structure based on the external load. If the load is large, the amount of steel used in the structure will increase.

3. The span of the steel frame
The larger span of the steel frame, the greater the amount of steel used per steel frame. More than 30 meters is considered a large width. If the steel frame has a large span and no center pillar, the amount of steel used will increase.

4. Structure
For steel structure buildings with cranes or mezzanine floors, to ensure the safe operation of cranes, steel columns will be increased, and columns of an equal cross-section will be adopted, which will increase the amount of steel used in the building.

Industrial Prefab Steel Structure Building , Metal Farm Shed Building 1

Industrial Prefab Steel Structure Building , Metal Farm Shed Building 2

FAQ:

 

Q1: Can I have a visit to your factory before the order?
A: Why not? Welcome to visit our factory. You can fly to Shenyang Taoxian Airport, then we will pick you up at the airport, hotel booking service is available.

Q2: Do you supply installation service?
A: Yes, we do. But you will pay for our professional installation cost at your local place, then we will send the engineers to supervise it.

Q3: How long can the frame be used?
A: The use life of the main structure is the designed used life, usually is 50-100 years (standard request of GB)

Q4: How long is the use life of the roof cover?
A: The use life of the PE coating is usually 10-25 years. The use life of roof sun light sheet is shorter, usually 8-15 years.

Q5: What is the anti-rust treatment for steel structure?
A: Anti-rust treatment of steel structure,

Normal anti-rust paint,
Anti-rust paint with epoxy zinc primer,
Hot-dip galvanization,
Hop-dip galvanization + PU finish,
Powder coating,
Stainless steel structure: No. 301/304/316 stainless steel structure.

Q6: How do we cooperate on certain project?
A: Firstly, please send us your project details and your requirements. Then we will design accordingly, free of charge.
Afterwards, please check and confirm whether you like the drawings. If not, we shall get the drawings revised until your confirmation. Finally we make a deal.