On March 15, 2024, our Brazilian client came to China to visit QHHK. His trip this time was mainly to discuss the specific structure and processing details of the steel bridge project. This project is a multi-lane steel bridge built in the suburbs of the city, with a total weight of approximately 95 tons.
He visited our office and factory, and we introduced our processing experience on engineered steel bridges and our company to him.
The project is currently in the drawing design stage, let us look forward to the next progress. |
![]() |
![]() |
![]() |