In September 2023, a Sri Lankan customer contacted us and wanted to build a workshop toilet paper manufacturing plant with a crane. At present, we have completed the shipment and are waiting for the customer to install it in the on-site workshop.
Within 60 days, we completed the structural design, steel component manufacturing, crane procurement and delivery together.
QHHK has direct crane suppliers and recommends the most economical and reliable models to customers based on their needs. Workshop Processing Video>>
Within 20 days, our factory completes all work including cutting, welding, grinding, rust removal, pre-assembly and spraying of steel components. At the same time, a steel frame pallet was made for the customer to package and fix all the steel beams.
![]() |
![]() |
![]() |
![]() |
The freight company contacted by our agent is responsible for all transportation matters from China to the customer’s port. We have chosen both conventional containers and open-top containers for our customers. Conventional containers carry steel beams, and open-top containers carry cranes and purlins.
![]() |
![]() |
![]() |
![]() |
Pre-Assembly of Steel Components
For prefabricated steel buildings, pre-assembly is a very important step.
Before processing, engineers and customers will agree on the final processing drawings. However, processing errors may occur during the processing, which is a very serious problem.
Because when the completed steel components are transported to the construction site, they may face fatal problems that cannot be connected and installed.
Re-work by the customer for secondary processing and modification will again incur a large amount of costs and will also delay the construction period.
However, many steel structure suppliers will omit the pre-assembly process because this will shorten the delivery cycle. This is why there are installation accidents during the construction of steel structure buildings every year.
QHHK regards pre-assembly as a key link, and we will strictly implement it regardless of the size of the project. Only if there are no problems with the pre-assembly will we carry out other work such as painting.
![]() |
![]() |
![]() |
![]() |