The construction site of the project is in Benxi Special Steel Plant, with a construction area of about 24,336 square meters (78*312 meters), and a total of about 3,500 tons of steel structure production and installation. Span 4A-4B is 30 meters, 4B-4C is 30 meters, 4C-4D is 27 meters, 27 axes;
The basic column spacing is 12 meters, the maximum column spacing of local columns is 36 meters, and the track top elevation is 10 meters and 12 meters. The external dimensions of the components are large, and the weight of a single piece is heavy. Among them, the maximum external dimension of the driving beam (length * width * height) is 36 meters * 3.2 meters, weighing about 44 tons; the largest steel column is about 22 meters long and weighs 10 tons.
Our company undertakes the on-site construction work of the project.